{
  "number": 400,
  "title": "3PAO audit rescue: prioritize failed evidence and overdue work items",
  "signal": "failed requirement, accountable owner and recovery evidence",
  "reference": "https://www.fedramp.gov/2026/reference/vulnerability-detection-and-response/",
  "decision": "Retain original findings, scope the engineering failure and verify the corrected artifact with the assessment team; preserve unresolved decisions.",
  "pitfalls": [
    "Editing a report is not remediation of the underlying system.",
    "Closing a task without a fresh verification can erase the failure history."
  ],
  "syntheticFixtures": [
    "scenario.synthetic.json"
  ]
}
